Hex Operating, LLC

Checking sign-in…

Job Setup:Set once. Attaches to every form you submit.
← Environmental audits

📘 Spill Contingency Plan Checklist

AS 46.04.030 and 18 AAC 75 Article 4 (oil discharge prevention and contingency plan), as the approved plan requires.

Audit information
Plan and records
Current approved plan is on site and accessible
Plan reflects current facilities, tanks and operations
Response contact list is current
Primary response action contractor contract is current
Prevention measures
Inspections and maintenance required by the plan are up to date
Leak detection and alarms working
Transfer procedures followed and records kept
Training records for spill responders are current
Response equipment
On-site response equipment matches the plan inventory
Equipment inspected and serviceable
Boom, sorbents and recovery equipment staged as the plan says
Communications equipment tested
Findings and corrective actions
Photos (take a picture or pick from your library or files, as many as you need)
Photos and PDFs, 15MB max each. Attachments lock when the form is submitted.

0 of 12 items answered