🛢️ SPCC Tank and Containment Inspection

40 CFR 112 (SPCC). Frequency and scope per the facility SPCC Plan.

Audit information
Tanks and containers
Tank shells free of leaks, rust, bulges or weeping
Tank labels and capacity markings legible
Level gauges and alarms working
Overfill protection in place and tested per plan
Portable containers (drums, totes) closed, labeled and on containment
Secondary containment
Containment free of oil, debris and standing water
Containment walls, liners and floors intact (no cracks or holes)
Drain valves closed and locked
Rainwater drained only after a sheen check, and the drainage was logged
Piping and transfer
Piping, valves and flanges free of leaks
Pipe supports sound
Transfer area has drip pans or containment
Loading or unloading area curbing and drains in good condition
Spill response
Spill kit stocked and accessible
Spill response contacts posted
Personnel briefed on SPCC procedures this year
Findings and corrective actions
Photos (take a picture or pick from your library or files, as many as you need)
Photos and PDFs, 15MB max each. Attachments lock when the form is submitted.

0 of 16 items answered